Siding

Fiber cement and engineered wood siding that lasts decades and shrugs off Houston weather.

Typical timeline: 4–6 weeks
Siding
New siding transforms your home's curb appeal and seals the envelope against wind-driven rain, humidity, and pests. We install James Hardie fiber cement, LP SmartSide engineered wood, and premium vinyl — always over a proper weather-resistive barrier with taped seams, not just tar paper stapled up in a hurry. Trim, corners, and window returns are detailed the way the manufacturer specifies so the warranty actually holds up.

Materials

What we install vs. what corner-cutters use.

Weather barrier

What we install

Full self-adhered WRB with taped seams and pan-flashed windows.

Common shortcut

6-mil felt stapled up with no flashing at windows.

Why it matters: Water gets behind every siding eventually — the barrier is what saves the sheathing.

Siding panel

What we install

James Hardie ColorPlus or LP SmartSide with factory finish.

Common shortcut

Bargain vinyl or field-painted hardboard.

Why it matters: Factory finishes last 15+ years; field paint fades in 3.

Fasteners

What we install

Stainless or hot-dipped galvanized ring-shank nails.

Common shortcut

Standard bright nails.

Why it matters: The wrong nail bleeds rust down your new siding within a year.

Process

A predictable path — with real durations.

1

Tear-off & inspection

2–3 days

Remove old siding, inspect sheathing, replace any rotted panels.

2

Weather barrier

1–2 days

Install self-adhered WRB, tape all seams, flash all penetrations.

3

Siding install

1–2 weeks

Panels, corner boards, trim, and window returns per manufacturer spec.

4

Paint & caulk

2–3 days

Field-caulk joints, prime and paint any field-cut edges.

5

Cleanup & walk

1 day

Nail sweep, haul-off, and warranty walkthrough.

Why us

Why homeowners pick Modern Builders for siding.

Most siding failures start behind the siding — bad WRB, missed flashings at windows, no kick-out flashings at the roof-wall intersection. We do the water management first and the pretty part second. We carry the James Hardie and LP SmartSide certifications. Your color is factory-applied, not field-painted, so it stays true for 15+ years. Every penetration gets a proper flashing, not a bead of caulk. And we haul away every scrap of old siding and nails — your yard is cleaner when we leave than when we arrived.

FAQs

Answers before you ask.

James Hardie vs LP SmartSide — which is better?+

Both are excellent. Hardie is more impact-resistant and non-combustible; LP is lighter and easier to work with. We'll recommend based on your exposure and goals.

Do you paint on-site?+

We prefer factory-finished ColorPlus so the color is warrantied for 15 years. If you want a custom color we can field-paint after install.

Will you replace rotted sheathing?+

Yes — it's included in the tear-off phase. We call you before covering anything so you can see it.

How long does the warranty last?+

30 years on Hardie panels, 15 years on ColorPlus finish, 5 years on our labor.

Get a quote — we do it right.

Fixed-price proposals, real timelines, no corners cut. Tell us about your siding project.

Request your quote