Solar Panels

Lower your energy bill with clean power.

Typical timeline: 4–8 weeks
Solar Panels
Rooftop solar PV design, permitting, and installation—with or without battery backup. We size the system to your actual usage, handle utility interconnection, and use tier-1 panels and inverters with 25-year warranties.

Materials

What we install vs. what corner-cutters use.

Panels

What we install

REC, Q Cells, or Silfab — tier-1 monocrystalline with 25-year product and performance warranties.

Common shortcut

Off-brand panels with a 10-year warranty from a company that may not exist in 10 years.

Why it matters: Panels sit on your roof for 25+ years. The warranty is only as good as the company standing behind it.

Inverters

What we install

Enphase microinverters or SolarEdge optimizers — panel-level production, shade tolerant.

Common shortcut

Single string inverter — one shaded panel drags the whole string down.

Why it matters: Panel-level electronics let you monitor and troubleshoot each panel, and shade on one panel doesn't kill array output.

Racking & attachments

What we install

IronRidge racking with flashed roof attachments — no roof leaks, ever.

Common shortcut

Sealant-only attachments that leak within 3 years.

Why it matters: How the racking meets your roof decides whether you get a solar system or a solar-shaped leak.

Battery (optional)

What we install

Tesla Powerwall 3 or Enphase IQ Battery with whole-home backup panel integration.

Common shortcut

Portable battery with an extension cord — no automatic switchover during outages.

Why it matters: A properly integrated battery keeps your house running through an outage. A portable unit doesn't.

Process

A predictable path — with real durations.

1

Site Assessment

1–2 days

Roof/ground survey, shade analysis, and utility bill review to size the array.

2

System Design

3–7 days

Panel layout, inverter selection, and structural/electrical drawings.

3

Permits & Utility

2–6 weeks

City permit + utility interconnection application submitted and tracked.

4

Installation

1–3 days

Racking, panels, wiring, inverter, and battery (if selected).

5

Inspection & PTO

1–4 weeks

City inspection, utility Permission-To-Operate, and system commissioning.

Customer projects across Houston

Drag to reveal the solar panels transformation.

Recent solar panels projects from neighborhoods across the Houston area. Drag the slider on each image to see the before and after.

The Heights · Solar Panels — afterThe Heights · Solar Panels — before
Before
After
The Heights · Solar Panels
Project 1 of 10The Heights, Houston

Why us

Why homeowners pick Modern Builders for solar panels.

We're a licensed general contractor, not a door-to-door sales lead broker. Local design, local install, local service—and honest ROI math with no inflated production estimates.

FAQs

Answers before you ask.

Should I add a battery?+

Under NEM 3.0, batteries dramatically improve payback. We'll model with and without.

What's the warranty?+

25 years on panels, 25 years on Enphase microinverters, 10–15 on batteries.

Will it work in a power outage?+

Only with a battery. Grid-tied panels alone shut off during outages by code.

Do I qualify for tax credits?+

The 30% federal ITC applies to most residential systems—we'll walk you through the paperwork.

Get a quote — we do it right.

Fixed-price proposals, real timelines, no corners cut. Tell us about your solar panels project.

Request your quote