Foundation leveling for pier & beam and slab homes — sticking doors, sloping floors, cracked walls.

Typical timeline: 1–3 weeks
House Leveling
Houston sits on expansive clay that swells and shrinks with every wet and dry season. That movement shows up as sloping floors, doors that stick, cracks stair-stepping through brick, and gaps opening at baseboards and crown molding. House leveling puts the structure back where it belongs and holds it there. We level both pier & beam and slab-on-grade homes. Pier & beam work means new concrete pier pads, shimming and replacing rotted sills and beams, and adjustable steel supports where they belong. Slab homes get pressed concrete or steel piles driven to load-bearing depth, then lifted in controlled increments while we monitor the interior. Every job starts with an elevation survey so we know exactly how much movement we are correcting, and ends with a second survey proving the result.

Materials

What we install vs. what corner-cutters use.

Piers

What we install

Pressed concrete or steel piles driven to load-bearing strata.

Common shortcut

Shallow pads set on loose soil.

Why it matters: Piers that do not reach stable soil settle again within a couple of seasons.

Shims

What we install

Steel shims and treated blocking on pier & beam work.

Common shortcut

Wood shims that rot and compress.

Why it matters: Wood shims in a damp Houston crawlspace crush and rot; steel holds the elevation.

Beams & sills

What we install

Replace rotted sills, beams, and joists before lifting.

Common shortcut

Leaving rotted wood in place and jacking over it.

Why it matters: Lifting rotted wood just breaks it — the repair has to start with sound structure.

Measurement

What we install

Zip-level elevation survey before and after.

Common shortcut

Eyeballing it with a level.

Why it matters: Documented elevations are the only way to prove the house actually moved.

Drainage

What we install

Grading, gutter extensions, and root barriers as needed.

Common shortcut

Ignoring the water that caused the movement.

Why it matters: If moisture keeps cycling under the foundation, the house moves again.

Process

A predictable path — with real durations.

1

Elevation survey

1 day

Zip-level readings across the floor plan, plus exterior and crawlspace inspection.

2

Engineering & plan

3–7 days

Pier count, spacing, and lift plan; structural engineer involved when the scope calls for it.

3

Access & excavation

1–2 days

Dig pier locations at the perimeter and interior access points.

4

Pier installation

2–5 days

Press concrete or steel piles to load-bearing depth, or pour new pads under pier & beam.

5

Controlled lift

1–3 days

Jack in increments, monitoring interior finishes and re-checking elevations.

6

Backfill & closeout

1–2 days

Backfill, restore landscaping, final elevation survey and photo report.

Customer projects across Houston

Drag to reveal the house leveling transformation.

Recent house leveling projects from neighborhoods across the Houston area. Drag the slider on each image to see the before and after.

The Heights · House Leveling — afterThe Heights · House Leveling — before
Before
After
The Heights · House Leveling
Project 1 of 10The Heights, Houston

Why us

Why homeowners pick Modern Builders for house leveling.

We measure before we quote. A zip-level survey across the whole floor tells us how much the house has actually moved and where — not a guess from a walkthrough. Lifts are done in slow, controlled increments so trim, tile, and drywall have a chance to travel with the structure instead of tearing. We also address the cause, not just the symptom. Poor drainage, leaking supply or sewer lines, and thirsty tree roots move Houston foundations. If we find one, you hear about it before we start lifting. Work is documented with photos and a closing elevation survey, and pier work carries a written warranty.

FAQs

Answers before you ask.

How do I know my house needs leveling?+

Doors and windows that stick, floors that slope or bounce, stair-step cracks in brick, gaps at baseboards or crown, and cracks over door frames. One of those alone may be nothing; several together usually means movement.

Will the cracks close up after the lift?+

Most tighten significantly. Some drywall and masonry cracks need patching afterward — we tell you up front which ones will likely need cosmetic repair.

How long does it take?+

Most pier & beam jobs run 3–7 days. Slab piling projects run 1–3 weeks depending on pier count and access.

Do I have to move out?+

No. Nearly all of the work happens outside and underneath, and you can stay in the house during the lift.

Is there a warranty?+

Yes — pier work carries a written transferable warranty, and we hand over before-and-after elevation surveys documenting the correction.

What causes foundation movement in Houston?+

Expansive clay soil cycling between wet and dry, plumbing leaks under the slab, poor drainage against the foundation, and large trees pulling moisture out of the soil.

Get a quote — we do it right.

Fixed-price proposals, real timelines, no corners cut. Tell us about your house leveling project.

Request your quote