Panel Box Upgrade
200A and 400A panel upgrades with modern breaker technology and surge protection.

Materials
What we install vs. what corner-cutters use.
Panel brand
Square D QO, Eaton BR, or Siemens with copper bus.
Federal Pacific, Zinsco (illegal), or off-brand.
Why it matters: Off-brand breakers don't trip reliably.
Surge protection
Type 2 SPD on the panel, whole-home coverage.
No surge protection.
Why it matters: One storm without surge protection can fry your appliances.
Labeling
Printed, updated schedule mounted in the panel.
Handwritten smeared labels from 1997.
Why it matters: Proper labels save time when you actually need them.
Process
A predictable path — with real durations.
Site check & permit
1 dayConfirm scope, pull electrical permit, schedule utility.
Panel swap
4–6 hoursUtility disconnect, remove old panel, install new panel, re-terminate all circuits.
Utility reconnect
1 hourUtility inspection and reconnect.
City inspection
1 dayCity electrical inspection and closeout.
Why us
Why homeowners pick Modern Builders for panel box upgrade.
We coordinate with CenterPoint to minimize the power-off window — usually 4–6 hours on install day. You know the exact window before we start. Every panel we install includes whole-home surge protection (Eaton SPD or equivalent). It's low-grade insurance against Texas thunderstorms. We leave labeled panel schedules — every breaker mapped to what it feeds, printed and mounted inside the panel door.
FAQs
Answers before you ask.
Do I need 200A or 400A?+
200A handles almost every home. Go 400A if you're planning a Level 2 EV charger, tankless electric water heater, and heat pump all at once, or if you're a large home over 4,000 sq ft.
How long will power be off?+
Usually 4–6 hours on install day. We coordinate with your schedule.
Can I add an EV charger later?+
Yes — every panel we install has spare breaker capacity for future circuits.
Do you replace the meter base too?+
Often yes when going from 100A to 200A. We handle it with the utility.
Related reading
Go deeper before you decide.
Get a quote — we do it right.
Fixed-price proposals, real timelines, no corners cut. Tell us about your panel box upgrade project.
Request your quote