← All services

Bathroom Remodeling

Spa-quality bathrooms with premium tile, fixtures and finishes.

Typical timeline: 3–6 weeks
Bathroom Remodeling
Full-scope bathroom transformations including plumbing, tile, vanities, showers and heated flooring.

Materials

What we install vs. what corner-cutters use.

Waterproofing

What we install

Full KERDI or Wedi membrane, corners banded, pan pre-sloped

Common shortcut

Cement board + plastic sheeting

Why it matters: A bonded waterproof layer is the only thing that keeps water out of the framing for 30+ years.

Shower pan

What we install

Pre-sloped foam pan or hot-mopped mud bed

Common shortcut

Deck mud dumped and hoped for the best

Why it matters: Correct slope + integrated drain means no standing water, no mold.

Tile setting

What we install

Modified thinset, backbuttered, 95%+ coverage

Common shortcut

5-spot dabs of mastic

Why it matters: Full coverage prevents hollow spots that crack under weight.

Plumbing

What we install

Pressure-balanced valves, accessible shutoffs, PEX runs

Common shortcut

Legacy compression fittings under drywall

Why it matters: Modern valves prevent scalds; accessible shutoffs prevent future demo.

Ventilation

What we install

110+ CFM fan on a timer, ducted to a roof cap

Common shortcut

Fan venting into the attic

Why it matters: Attic-vented moisture is the #1 cause of hidden mold and rotted rafters.

Process

A predictable path — with real durations.

1

Design & selections

1–2 weeks

Layout, tile, plumbing fixtures, vanity.

2

Demo & rough-in

3–5 days

Full demo to studs, plumbing and electrical moves, inspection.

3

Waterproofing

2–3 days

Membrane, pan, flood test.

4

Tile & drywall

1–2 weeks

Wall tile, floor tile, grout, drywall and paint.

5

Vanity, glass, trim

3–5 days

Vanity, mirror, plumbing trim, glass enclosure, punch.

Why us

Why homeowners pick Modern Builders for bathroom remodeling.

Bathrooms are where cheap builds fail first. We waterproof to Schluter/KERDI spec, use real mortar-set tile, and vent every fan to the exterior. If it can leak, we test it before we close it up.

FAQs

Answers before you ask.

How long is the bathroom unusable?+

Typically the full duration — but if it's your only bath we build a schedule that gets the shower running as fast as possible.

Do you offer curbless showers?+

Yes. They require a lowered subfloor and proper linear drain — we do it right, not with a ramp.

Can you match old tile?+

For repairs, sometimes. For a whole remodel we recommend new tile floor-to-ceiling for a warrantable waterproofing system.