Bathroom Remodeling

Spa-quality bathrooms with premium tile, fixtures and finishes.

Typical timeline: 5–8 weeks
Bathroom Remodeling
Full-scope bathroom transformations including plumbing, tile, vanities, showers and heated flooring.

Materials

What we install vs. what corner-cutters use.

Waterproofing

What we install

Red Guard liquid waterproofing membrane, rolled on to full coverage with corners banded

Common shortcut

Cement board + plastic sheeting

Why it matters: A bonded waterproof layer is the only thing that keeps water out of the framing for 30+ years.

Shower base

What we install

Proper shower liner (pan liner) installed and flood-tested before tile

Common shortcut

No waterproof shower liner or membrane — they expect the tile and grout to do the waterproofing.

Why it matters: A tested liner is the difference between a shower that lasts decades and one that leaks into the ceiling below.

Tile setting

What we install

Modified thinset, properly troweled and back-buttered for 95%+ coverage

Common shortcut

5-spot dabs of mastic

Why it matters: Full coverage prevents hollow spots that crack tile and grout under weight.

Shower floor tile

What we install

Non-slip tile rated for wet areas

Common shortcut

Whatever polished tile matches the walls

Why it matters: Slippery shower floors are one of the most common in-home injuries — the right tile prevents falls.

Shower glass

What we install

Custom frameless tempered glass, 1/4" thick, measured after tile

Common shortcut

Off-the-shelf framed enclosure or thin glass

Why it matters: Custom 1/4" frameless glass looks cleaner, seals better, and won't rattle or leak at the frame.

Built-ins

What we install

Shampoo niches, benches, multiple shower heads (rain head + handheld wand), and handicap accessories when requested

Common shortcut

None — skipped to save framing and plumbing time

Why it matters: These are the details that make a shower actually usable every day — and they're nearly impossible to add later without tearing the wall open.

Drain & layout

What we install

Drain relocated and centered to the new shower layout

Common shortcut

Drain left off-center where the old tub sat

Why it matters: An off-center drain means standing water and a shower that never looks right.

Electrical

What we install

GFCI protection at every wet-area outlet, waterproof recessed lights rated for shower zones

Common shortcut

Standard outlets and non-rated cans

Why it matters: GFCIs and wet-rated fixtures are code and safety — not optional in a bathroom.

Wall board

What we install

Moisture-resistant green board on bathroom walls (cement board or foam board behind tile)

Common shortcut

Standard drywall

Why it matters: Green board resists the humidity a bathroom sees every day; standard drywall crumbles behind vanities and around toilets.

Plumbing

What we install

Pressure-balanced valves, accessible shutoffs, PEX runs

Common shortcut

Legacy compression fittings buried in drywall

Why it matters: Modern valves prevent scalds; accessible shutoffs prevent future demo.

Ventilation

What we install

110+ CFM fan on a timer, ducted to a roof cap

Common shortcut

Fan venting into the attic

Why it matters: Attic-vented moisture is the #1 cause of hidden mold and rotted rafters.

Valves & Fittings

What we install

Name-brand valves, cartridges, and fittings from trusted manufacturers

Common shortcut

Off-brand valves, cartridges, and compression fittings chosen to save a few

Why it matters: low-grade valves and fittings wear out within a year. When they fail behind the wall, the only way to replace them is to demo the tile, fixtures, and surrounding finishes — turning a small part into a major rebuild.

Process

A predictable path — with real durations.

1

Design & selections

1–3 days

Layout, tile, plumbing fixtures, vanity. We bring samples to your home so you can see them in your own light.

2

Demo & permits

4–6 days

Full demo to studs. We pull permits if the scope requires them.

3

Rough-in & inspection

4–6 days

Plumbing and electrical moves, drain relocation, GFCIs, then inspection where required.

4

Shower liner, framing & insulation

3–5 days

Install the shower liner and flood-test it. Adjust framing and add or replace insulation while the walls are open.

5

Tile & drywall

1-2 weeks

Red Guard waterproofing, wall tile, non-slip floor tile, grout, green board and paint.

6

Vanity, glass, trim

5–7 days

Vanity, mirror, plumbing trim, custom 1/4" frameless tempered glass enclosure, punch list.

7

Clean up

1–2 days

Full jobsite clean, protective coverings removed, final walkthrough.

Customer projects across Houston

Drag to reveal the bathroom remodel transformation.

Recent bathroom remodel projects from neighborhoods across the Houston area. Drag the slider on each image to see the before and after.

The Heights · Bathroom Remodel — afterThe Heights · Bathroom Remodel — before
Before
After
The Heights · Bathroom Remodel
Project 1 of 10The Heights, Houston

Why us

Why homeowners pick Modern Builders for bathroom remodeling.

Most homeowners remodel a bathroom only once or twice while they own a home — but the finishes and the work behind them are what you live with for decades. That is why cutting corners is so problematic: leaks, slow drains, weak water pressure, and mold behind the wall usually show up years later. And because a bathroom is permanent, a small fix behind the tile means tearing everything down and rebuilding it. A small problem quickly becomes a large one. We build it right the first time. Every shower is waterproofed with Red Guard and gets a real shower liner that we flood-test. Every fan is vented to the exterior. We use name-brand valves and fittings, not the off-brand parts some contractors install to save a few — those low-grade parts wear out within a year, and replacing them behind the tile means breaking the shower wall. Shampoo niches, benches, rain heads, handheld wands, and 1/4" frameless custom glass are standard here, not upsells. And if it can leak, we test it before we close it up.

FAQs

Answers before you ask.

How long is the bathroom unusable?+

Typically the full duration — but if it's your only bath we build a schedule that gets the shower running as fast as possible. If you'd like, we can add a temporary bathroom to the scope so you're never without one.

Do you offer curbless / no-step showers?+

Yes. They require a lowered subfloor and a proper linear drain — we do it right, not with a ramp.

Do you build ADA bathrooms and install walk-in tubs?+

Yes. We do full ADA bathrooms, grab bars with proper blocking, curbless showers, and walk-in tub installations.

Do you help with material selection?+

Yes. We offer white-glove material selection, which means we bring samples and options directly to your home — tile, stone, vanity finishes, hardware — so you can view and choose everything in your own space, in your own light, next to what you're keeping. No running around to multiple showrooms and supply houses.

Can you match old tile?+

For small repairs, sometimes. For a whole remodel we recommend new tile floor-to-ceiling for a warrantable waterproofing system.